SAM is a resource for tools, samples, examples, guidance, and training. An integral part of successfully obtaining a service contract is completing the Requirements Roadmap Worksheet. The key objective of the Roadmap is to facilitate developing a Performance Work Statement (PWS) based on clear Task Statements and Performance Standards.
Task Statements define what specific actions or outcomes must be accomplished to satisfy a requirement. They consist of verbs and nouns that objectively describe the outcome or performance requirement.
To watch a video about writing effective Task Statements, visit the Video Kiosk. For a list of sample verbs and nouns often used to create Task Statements, go to the Sample Performance Element Components page.
Task Statement | Results | Context | Actions |
---|---|---|---|
Analyze and define architecture baselines for the Program Office | architecture baselines | Program Office | analyze, define |
Analyze and support Process Improvements for XYZ System | process improvements | XYZ System | analyze, support |
Analyze, scan, test, and audit the network for the Computer Lab | network | Computer Lab | analyze, audit, scan, test |
Assess emerging technology and capabilities for the Computer Lab | emerging technology, capabilities | Computer Lab | assess |
Assist in and develop Information Assurance (IA) policy and procedure documents for the Program Office | Information Assurance (IA) policy, procedure documents | Program Office | assist in, develop |
Automate and generate online reports for the Program Office | online reports | Program Office | automate, generate |
Capture, collate, and report installation safety issues for XYZ System | installation safety issues | XYZ System | capture, collate, report |
Conduct periodic facility requirements analysis for the Program Office | periodic facility requirements analysis | Program Office | conduct |
Conduct system assessments and analyses for the Program Office | analyses, system assessments | Program Office | conduct |
Conduct system testing, subsystem testing, and component testing for the Computer Lab | system testing, subsystem testing, component testing | Computer Lab | conduct |
Conduct, provide, support, and develop special studies, briefings, papers, and status reports for XYZ System | special studies, briefings, papers, status reports | XYZ System | conduct, develop, provide, support |
Copy, collate, print, and bind technical publications and presentation materials for the Program Office | technical publications, presentation materials | Program Office | bind, collate, copy, print |
Create and maintain systems administration documentation, logbooks, and procedure documentation for the Computer Lab | systems administration documentation, logbooks, procedure documentation | Computer Lab | create, maintain |
Create and manage facility checklists for the Program Office | facility checklists | Program Office | create, manage |
Create, update, and provide storyboards and reports for the Program Office | storyboards, reports | Program Office | create, provide, update |
Design, develop, and distribute Curricula for the Program Office | curricula | Program Office | design, develop, distribute |
Develop and analyze program metrics for the Program Office | program metrics | Program Office | analyze, develop |
Develop and integrate risk management plans and risk management strategies for XYZ System | risk management plans, risk management strategies | XYZ System | develop, integrate |
Develop and maintain Interface Control Documents (ICD) for XYZ System | XYZ System | develop | maintain |
Develop and recommend mission assurance process improvements for the Program Office | mission assurance process improvements | Program Office | develop, recommend |
Develop handbooks, training courses, and computer based training for the Computer Lab | handbooks, training courses, computer based training | Computer Lab | develop |
Distribute CD ROMs, Personal Computers (PC), and peripherals for the Computer Lab | Personal Computers (PC), peripherals, CD ROMs | Computer Lab | distribute |
Establish and maintain user accounts for the Computer Lab | user accounts | Computer Lab | establish, maintain |
Evaluate system test plans for XYZ System | system test plans | XYZ System | evaluate |
Evaluate, participate, and prepare Program Management Review (PMR), Integrated Baseline Review (IBR), technical reviews, and audits for the Program Office | Program Management Review (PMR), Integrated Baseline Review(IBR), technical reviews, audits | Program Office | evaluate, participate, prepare |
Generate certification documentation for XYZ System | certification documentation | XYZ System | generate |
Generate, maintain, and establish training requirements, files, forms, and file plans for the Program Office | training requirements, files, forms, file plans | Program Office | establish, generate, maintain |
Hire qualified instructors and facilitators for the Program Office | qualified instructors, facilitators | Program Office | hire |
Identify and assess cross-schedule risk for the Program Office | cross-schedule risk | Program Office | assess, identify |
Identify, maintain, and manage deficiency reporting documentation for the Program Office | deficiency reporting documentation | Program Office | identify, maintain, manage |
Interface and coordinate Video Teleconferencing (VTC) for the Program Office | Video Teleconferencing (VTC) | Program Office | coordinate, interface |
Maintain multimedia equipment for the Computer Lab | multimedia equipment | Computer Lab | maintain |
Maintain tracking system for XYZ System | tracking system | XYZ System | maintain |
Manage and operate facsimile equipment for the Computer Lab | facsimile equipment | Computer Lab | manage, operate |
Manage Program Assets for the Program Office | program assets | Program Office | manage |
Monitor and analyze communications traffic, call legitimacy, and cost for the Program Office | communications traffic, call legitimacy, cost | Program Office | analyze, monitor |
Oversee prime contractor performance and subcontractor performance for the Program Office | prime contractor performance, subcontractor performance | Program Office | oversee |
Perform database analysis for XYZ System | database analysis | XYZ System | perform |
Perform quality assurance reviews for the Program Office | quality assurance reviews | Program Office | perform |
Perform security accreditation and certification for XYZ System | security accreditation, certification | XYZ System | perform |
Plan and implement pre-acquisition strategy and acquisition strategy for the Program Office | pre-acquisition strategy, acquisition strategy | Program Office | implement, plan |
Plan, develop, and maintain system program capabilities and operational concepts for the Program Office | system program capabilities, operational concepts | Program Office | develop, maintain, plan |
Plan, track, and schedule milestones for the Program Office | milestones | Program Office | plan, schedule, track |
Prepare and maintain operating instructions for XYZ System | operating instructions | XYZ System | maintain, prepare |
Prepare briefings, staff coordination, and decision documentation for the Program Office | briefings, staff coordination, decision documentation | Program Office | prepare |
Prepare for and present Preliminary Design Reviews (PDR) and Critical Design Reviews (CDR) for the Program Office | Preliminary Design Reviews (PDR), Critical Design Reviews (CDR) | Program Office | prepare for, present |
Prepare, handle, and process Memorandum of Understanding (MOU), Memorandum of Agreement (MOA), and Trading Partner Agreements (TPA) for the Program Office | Memorandum of Understanding (MOU), Memorandum of Agreement (MOA), Trading Partner Agreements (TPA) | Program Office | handle, prepare, process |
Provide and support bridge scheduling and connectivity for the Computer Lab | bridge scheduling, connectivity | Computer Lab | provide, support |
Provide change control analysis, status reporting, tracking, and control actions for the Program Office | change control analysis, status reporting, tracking, control actions | Program Office | provide |
Provide content imaging, archiving, and retrieval for the Computer Lab | content imaging, archiving, retrieval | Computer Lab | provide |
Provide data asset reporting and data change impact analysis for the Program Office | data asset reporting, data change impact analysis | Program Office | provide |
Provide IT support for the Program Office | IT support | Program Office | provide |
Provide management support for XYZ System | management support | XYZ System | provide |
Provide Tier 2 customer support for XYZ System | Tier 2 customer support | XYZ System | provide |
Review system specifications, system segment specifications, equipment specifications, and Interface Control Documents (ICD) for the Program Office | system specifications, system segment specifications, equipment specifications, Interface Control Documents (ICD) | Review the system design baseline, architecture, and interoperability requirements for XYZ System | system design baseline, architecture, architecture, interoperability requirements |
Support Data Disaster Recovery for XYZ System | data disaster recovery | XYZ System | support |
Support Modeling and Simulation (M∓S) Requirements for the Program Office | Modeling and Simulation (M&S) requirements | Program Office | support |
Support multimedia events for the Program Office | multimedia events | Program Office | support |
Support system integration, test planning, and test execution for XYZ System | system integration, test planning, test execution | XYZ System | support |
Support system level architecture, planning, and management for the Program Office | management, planning, system level architecture | Program Office | support |
Support systems test safety engineering for XYZ System | systems test safety engineering | XYZ System | support |
Troubleshoot and resolve network operating system software problems for the Program Office | network operating system software problems | Program Office | resolve, troubleshoot |
Update facility floor plan configurations for the Computer Lab | facility floor plan configurations | Computer Lab | update |
Update training database for the Computer Lab | training database | Computer Lab | update |