step icon Step 30 | Block 16 Entries


If a DID is tailored, describe which DID requirements are not required.

Media and format requirements. If able accept the contractor format but ensure the format is readable by the Government.

Block 16 should contain the exact verbiage of the applicable distribution statement annotated in Block 9, export control warnings, or other markings. These type markings are determined by the controlling DOD office. See DoDI 5230.24 for more information.

If Block 8 is marked “A”, describe Govt review/contractor turnaround times and how the deliverable will be evaluated.

If the inspecting and accepting authority is not the first addressee in Block 14, a qualifying remark should be inserted in Block 16.